Scope highlights
- Initial installation areas and materials documented before work began
- System mats/panels installed across multiple interior spaces
- Manifold and control cabinet areas prepared and connected
- Heating tubing routed through rooms, hallways, and complex floor shapes
- Completed tubing layout prepared for the next floor build-up phase
